Glintify finds weld seams between the parts of a STEP assembly, measures their length and proposes throat thickness a from the wall thickness. The drawing's weld symbols to ISO 2553 and general weld notes are read in, and the estimator links them to the seams. The price is calculated in standard mode from length and rate, or in the detailed calculation from throat a, volume, arc time and post-processing. Anything without a basis gets no price until the estimator has confirmed it.
What Glintify detects
The system analyzes the part's geometry and extracts every manufacturing-relevant feature without manual input.
Contact pairs between solids, joint family, seam length per segment, wall thickness, modelled weld beads, corner seams at bends, purchased parts by designation
What is calculated automatically
All measurements are extracted directly from the geometry.
Quality rules
The system automatically checks whether the part fits within your capacity and flags designs that can cause production issues.
Typical setup
What a typical setup looks like for this operation.
Cost example
Line-by-line breakdown of the part cost using your machine data and prices.
| Cost item | Amount |
|---|---|
| Tack welding and cleaning, 8 seams | SEK 38.00 |
| Arc time 2.4 m, a3, MAG 135 | SEK 62.00 |
| Filler material and gas | SEK 9.50 |
| Clamping and visual inspection | SEK 14.00 |
| Weld cost per assembly, illustrative example | SEK 123.50 |
The same routing line as in Monitor
On top of our time-based calculation, welding is also costed as a routing line ("beredningsrad") in Monitor's format: production group (work center), setup time, cycle time, allowance (F-time) and piece time, priced with the production group's cost factors. The line can be exported as an article with routing straight to your ERP system.
| Routing line | Explanation |
|---|---|
| Production group | Fetched from your ERP system or created from the machine park |
| Setup time | Per batch, not per piece — spread over the quantity |
| Cycle time | The technical time per piece, calculated from the geometry |
| F-time % | Allowance on top of the cycle time |
| Piece time | Cycle time × (1 + F-time %) |
| Cost factors | Machine, wages + social charges and fixed manufacturing overhead in SEK/h, with a staffing factor |
Markups for MO (material overhead), LO (subcontracting overhead), AFFO (general overhead) and profit are added at quote level — exactly as in Monitor's pre-calculation.