Assembly
Glintify analyses the assembly's constituent parts and suggests assembly steps based on geometry and fit conditions. Screw joints are detected by position and dimension, torque tightening (torque + angle) is calculated per joint. Press fits are identified from tolerance data. Fixture and packaging cost is added per product.
What Glintify detects
The system analyzes the part's geometry and extracts every manufacturing-relevant feature without manual input.
Number of parts, fit conditions, screw joints, fixture requirements
What is calculated automatically
All measurements are extracted directly from the geometry.
Quality rules
The system automatically checks whether the part fits within your capacity and flags designs that can cause production issues.
Typical setup
What a typical setup looks like for this operation.
Cost example
Line-by-line breakdown of the part cost using your machine data and prices.
| Cost item | Amount |
|---|---|
| Assembly 6 parts (screw joints) | SEK 28.00 |
| Fixture (amortised 500 pcs) | SEK 2.00 |
| Press fit ×2 | SEK 4.00 |
| Packaging (box + pallet) | SEK 11.50 |
| Total assembly cost per product | SEK 45.50 |
The same routing line as in Monitor
On top of our time-based calculation, assembly is also costed as a routing line ("beredningsrad") in Monitor's format: production group (work center), setup time, cycle time, allowance (F-time) and piece time, priced with the production group's cost factors. The line can be exported as an article with routing straight to your ERP system.
| Routing line | Explanation |
|---|---|
| Production group | Fetched from your ERP system or created from the machine park |
| Setup time | Per batch, not per piece — spread over the quantity |
| Cycle time | The technical time per piece, calculated from the geometry |
| F-time % | Allowance on top of the cycle time |
| Piece time | Cycle time × (1 + F-time %) |
| Cost factors | Machine, wages + social charges and fixed manufacturing overhead in SEK/h, with a staffing factor |
Markups for MO (material overhead), LO (subcontracting overhead), AFFO (general overhead) and profit are added at quote level — exactly as in Monitor's pre-calculation.
Other operations in Glintify
Calculate your own part
Upload a STEP file, we run the analysis and show exactly what the system detects for assembly. No manuals, no calls.