Internal and external threads

    Tapping

    Glintify extracts thread information from PMI data or geometric analysis (cylindrical hole with helical groove). Each thread is classified by type, pitch, diameter and tolerance. The system picks the right threading method, cutting tap for standard, roll tap for high strength, thread milling for large diameters, based on material and requirements.

    // Detection

    What Glintify detects

    The system analyzes the part's geometry and extracts every manufacturing-relevant feature without manual input.

    Extracted data

    Thread type, pitch, diameter, length, internal/external, tolerance class

    // Automation

    What is calculated automatically

    All measurements are extracted directly from the geometry.

    Number of threads per part
    Thread type (M, UNC, UNF, G, R, NPT)
    Pitch and diameter
    Thread length and bottom (through/blind)
    Tolerance class (6H, 6g, etc)
    // Quality

    Quality rules

    The system automatically checks whether the part fits within your capacity and flags designs that can cause production issues.

    Thread at hole bottom < 2·pitch → tap breakage risk
    Material > 35 HRC → roll tap or thread milling
    Thread in thin-walled part → deformation risk
    Unlubricated thread in stainless → galling
    // Setup

    Typical setup

    What a typical setup looks like for this operation.

    Tool choice: tap, roll tap, thread mill
    Lubrication per operation
    Tap life monitored
    Check measurement per batch start
    // Example

    Cost example

    Line-by-line breakdown of the part cost using your machine data and prices.

    Cost itemAmount
    Thread M6×1 (through × 8)SEK 12.00
    Thread M10×1.5 (blind × 4)SEK 8.00
    Tool wearSEK 2.40
    Setup per batchSEK 4.50
    Total tapping cost per partSEK 26.90
    // Costing in Monitor's format

    The same routing line as in Monitor

    On top of our time-based calculation, tapping is also costed as a routing line ("beredningsrad") in Monitor's format: production group (work center), setup time, cycle time, allowance (F-time) and piece time, priced with the production group's cost factors. The line can be exported as an article with routing straight to your ERP system.

    Routing lineExplanation
    Production groupFetched from your ERP system or created from the machine park
    Setup timePer batch, not per piece — spread over the quantity
    Cycle timeThe technical time per piece, calculated from the geometry
    F-time %Allowance on top of the cycle time
    Piece timeCycle time × (1 + F-time %)
    Cost factorsMachine, wages + social charges and fixed manufacturing overhead in SEK/h, with a staffing factor
    Cost = setup time × rate + piece time × rate × quantity

    Markups for MO (material overhead), LO (subcontracting overhead), AFFO (general overhead) and profit are added at quote level — exactly as in Monitor's pre-calculation.

    Calculate your own part

    Upload a STEP file, we run the analysis and show exactly what the system detects for tapping. No manuals, no calls.