Purchased hardware and fasteners
Press nuts, weld nuts, rivet nuts and screws often sit as separate solids in the STEP assembly. Glintify recognises them by their designation, checks that the geometry matches the type and keeps them out of cutting, bending and welding. Instead they are priced as purchase plus fitting method with your times and rates. If a price or method is missing, the direct price stops instead of becoming zero. Recognition requires a metric designation in the STEP name.
What Glintify detects
The system analyzes the part's geometry and extracts every manufacturing-relevant feature without manual input.
Designation in the STEP name, shank diameter, length, hole in the host part, position in the assembly, quantity per designation
What is calculated automatically
All measurements are extracted directly from the geometry.
Quality rules
The system automatically checks whether the part fits within your capacity and flags designs that can cause production issues.
Typical setup
What a typical setup looks like for this operation.
Cost example
Line-by-line breakdown of the part cost using your machine data and prices.
| Cost item | Amount |
|---|---|
| 4 × press nut M6, purchase | SEK 6.00 |
| Pressing 4 × 4 s | SEK 1.10 |
| 2 × weld nut M8, purchase | SEK 3.20 |
| Projection welding 2 pcs | SEK 2.40 |
| Purchased hardware per assembly, illustrative example | SEK 12.70 |
The same routing line as in Monitor
On top of our time-based calculation, purchased hardware and fasteners is also costed as a routing line ("beredningsrad") in Monitor's format: production group (work center), setup time, cycle time, allowance (F-time) and piece time, priced with the production group's cost factors. The line can be exported as an article with routing straight to your ERP system.
| Routing line | Explanation |
|---|---|
| Production group | Fetched from your ERP system or created from the machine park |
| Setup time | Per batch, not per piece — spread over the quantity |
| Cycle time | The technical time per piece, calculated from the geometry |
| F-time % | Allowance on top of the cycle time |
| Piece time | Cycle time × (1 + F-time %) |
| Cost factors | Machine, wages + social charges and fixed manufacturing overhead in SEK/h, with a staffing factor |
Markups for MO (material overhead), LO (subcontracting overhead), AFFO (general overhead) and profit are added at quote level — exactly as in Monitor's pre-calculation.